NEPRA Caps NGC Transmission Losses at 2.5%, Disallowing 37.6 GWh in September Fuel Adjustment
Pakistan's National Electric Power Regulatory Authority applied a 2.5% cap to transmission losses on the National Grid Company's network when it set the fuel charges adjustment for September 2026, according to the decision notified on 6 November.
The Central Power Purchasing Agency reported total transmission losses of 430.995 GWh for the month. NGC reported 427.921 GWh of transmission and transformation losses, of which 51.894 GWh were on the Pakistan Matiari-Lahore HVDC line, leaving a net 376.028 GWh on its own network after auxiliary consumption. NEPRA used NGC's lower figure but then capped the network losses at the 2.5% allowed for the 500 kV and 220 kV system in NGC's investment plan decision, counting 338.401 GWh.
By our calculation, the cap removed 37.6 GWh of losses from the September fuel cost pass-through. The HVDC line's losses were within its own cap of up to 4.3% and were counted in full.
NEPRA noted that September is the third month of the 2026-27 financial year. If NGC's losses stay within the allowed percentage on an accumulated basis by the end of the year, the units deducted in this monthly adjustment may be allowed back through a prior-year adjustment in NGC's next tariff.
The decision approved a fuel charges adjustment of Rs2.3673 per kWh for September against the Rs2.5624 requested by CPPA-G, to be billed in November. A dissenting note from one member is attached to the decision.